Storm Station
Sign in

Live/Water/Oregon/Rrv Cnl Blo Junction

Rrv Cnl Blo Junction

A water gauge in Jackson County, Oregon. Its stage was 0.01 ft as of Oct 15, 9:30 PM PDT.

Gauge JUNO3Jackson County, OregonEvery gauge in Oregon

Stage now
0.01 ftreported Oct 15, 9:30 PM PDT
24 hour change
No changesince Oct 14, 9:30 PM
Elevation
3,415 ftabove sea level
County
Jackson County
Position
42.7139° N, 122.6056° W
Record since
2010

Water level

Rrv Cnl Blo Junction

Stage is the height of the water's surface above the gauge's own fixed zero, in feet, not the depth of the water. Every point drawn is a reading the gauge sent, at the time it sent it.

Water level, 24 hours at Rrv Cnl Blo Junction: the water from 0.01 to 0.01 feet of stage, the latest 0.01 feet.WATER LEVEL, 24 HOURSFTHIGH 0.01 FT, OCT 14, 10:15 PM · LOW 0.01 FT, OCT 14, 10:15 PM-0.020.000.020.040.06Oct 153 AM6 AM9 AM12 PM3 PM6 PM9 PM0.01
Latest
0.01 ftOct 15, 9:30 PM
Highest
0.01 ftOct 14, 10:15 PM
Lowest
0.01 ftOct 14, 10:15 PM
Range
0.00 fthighest less lowest
Change
No changesince Oct 14, 10:15 PM
Readings
94
The readings these charts were drawn from, as a table
TimeStage ft
Oct 15, 9:30 PM0.01
Oct 15, 9:15 PM0.01
Oct 15, 9:00 PM0.01
Oct 15, 8:45 PM0.01
Oct 15, 8:30 PM0.01
Oct 15, 8:15 PM0.01
Oct 15, 8:00 PM0.01
Oct 15, 7:45 PM0.01
Oct 15, 7:30 PM0.01
Oct 15, 7:15 PM0.01
Oct 15, 7:00 PM0.01
Oct 15, 6:45 PM0.01
Oct 15, 6:30 PM0.01
Oct 15, 6:15 PM0.01
Oct 15, 6:00 PM0.01
Oct 15, 5:45 PM0.01
Oct 15, 5:30 PM0.01
Oct 15, 5:15 PM0.01
Oct 15, 5:00 PM0.01
Oct 15, 4:45 PM0.01
Oct 15, 4:30 PM0.01
Oct 15, 4:15 PM0.01
Oct 15, 4:00 PM0.01
Oct 15, 3:45 PM0.01
Oct 15, 3:30 PM0.01
Oct 15, 3:15 PM0.01
Oct 15, 3:00 PM0.01
Oct 15, 2:45 PM0.01
Oct 15, 2:30 PM0.01
Oct 15, 2:15 PM0.01
Oct 15, 2:00 PM0.01
Oct 15, 1:45 PM0.01
Oct 15, 1:30 PM0.01
Oct 15, 1:15 PM0.01
Oct 15, 1:00 PM0.01
Oct 15, 12:45 PM0.01
Oct 15, 12:30 PM0.01
Oct 15, 12:15 PM0.01
Oct 15, 12:00 PM0.01
Oct 15, 11:45 AM0.01
Oct 15, 11:30 AM0.01
Oct 15, 11:15 AM0.01
Oct 15, 11:00 AM0.01
Oct 15, 10:45 AM0.01
Oct 15, 10:30 AM0.01
Oct 15, 10:15 AM0.01
Oct 15, 10:00 AM0.01
Oct 15, 9:45 AM0.01
Oct 15, 9:30 AM0.01
Oct 15, 9:15 AM0.01
Oct 15, 9:00 AM0.01
Oct 15, 8:45 AM0.01
Oct 15, 8:30 AM0.01
Oct 15, 8:15 AM0.01
Oct 15, 8:00 AM0.01
Oct 15, 7:45 AM0.01
Oct 15, 7:30 AM0.01
Oct 15, 7:15 AM0.01
Oct 15, 7:00 AM0.01
Oct 15, 6:45 AM0.01
Oct 15, 6:30 AM0.01
Oct 15, 6:15 AM0.01
Oct 15, 6:00 AM0.01
Oct 15, 5:45 AM0.01
Oct 15, 5:30 AM0.01
Oct 15, 5:15 AM0.01
Oct 15, 5:00 AM0.01
Oct 15, 4:45 AM0.01
Oct 15, 4:30 AM0.01
Oct 15, 4:15 AM0.01
Oct 15, 4:00 AM0.01
Oct 15, 3:45 AM0.01
Oct 15, 3:30 AM0.01
Oct 15, 3:15 AM0.01
Oct 15, 3:00 AM0.01
Oct 15, 2:45 AM0.01
Oct 15, 2:30 AM0.01
Oct 15, 2:15 AM0.01
Oct 15, 2:00 AM0.01
Oct 15, 1:45 AM0.01
Oct 15, 1:30 AM0.01
Oct 15, 1:15 AM0.01
Oct 15, 1:00 AM0.01
Oct 15, 12:45 AM0.01
Oct 15, 12:30 AM0.01
Oct 15, 12:15 AM0.01
Oct 15, 12:00 AM0.01
Oct 14, 11:45 PM0.01
Oct 14, 11:30 PM0.01
Oct 14, 11:15 PM0.01
Oct 14, 11:00 PM0.01
Oct 14, 10:45 PM0.01
Oct 14, 10:30 PM0.01
Oct 14, 10:15 PM0.01
Water level, 7 days at Rrv Cnl Blo Junction: the water from 0.01 to 0.01 feet of stage, the latest 0.01 feet.WATER LEVEL, 7 DAYSFTHIGH 0.01 FT, OCT 8, 10:15 PM · LOW 0.01 FT, OCT 8, 10:15 PM-0.020.000.020.040.06Fri 9Sat 10Sun 11Mon 12Tue 13Wed 14Thu 150.01
Latest
0.01 ftOct 15, 9:30 PM
Highest
0.01 ftOct 8, 10:15 PM
Lowest
0.01 ftOct 8, 10:15 PM
Range
0.00 fthighest less lowest
Change
No changesince Oct 8, 10:15 PM
Readings
666
The readings these charts were drawn from, as a table
TimeStage ft
Oct 15, 9:30 PM0.01
Oct 15, 8:45 PM0.01
Oct 15, 7:45 PM0.01
Oct 15, 6:45 PM0.01
Oct 15, 5:45 PM0.01
Oct 15, 4:45 PM0.01
Oct 15, 3:45 PM0.01
Oct 15, 2:45 PM0.01
Oct 15, 1:45 PM0.01
Oct 15, 12:45 PM0.01
Oct 15, 11:45 AM0.01
Oct 15, 10:45 AM0.01
Oct 15, 9:45 AM0.01
Oct 15, 8:45 AM0.01
Oct 15, 7:45 AM0.01
Oct 15, 6:45 AM0.01
Oct 15, 5:45 AM0.01
Oct 15, 4:45 AM0.01
Oct 15, 3:45 AM0.01
Oct 15, 2:45 AM0.01
Oct 15, 1:45 AM0.01
Oct 15, 12:45 AM0.01
Oct 14, 11:45 PM0.01
Oct 14, 10:45 PM0.01
Oct 14, 9:45 PM0.01
Oct 14, 8:45 PM0.01
Oct 14, 7:45 PM0.01
Oct 14, 6:45 PM0.01
Oct 14, 5:45 PM0.01
Oct 14, 4:45 PM0.01
Oct 14, 3:45 PM0.01
Oct 14, 2:45 PM0.01
Oct 14, 1:45 PM0.01
Oct 14, 12:45 PM0.01
Oct 14, 11:45 AM0.01
Oct 14, 10:45 AM0.01
Oct 14, 9:45 AM0.01
Oct 14, 8:45 AM0.01
Oct 14, 7:45 AM0.01
Oct 14, 6:45 AM0.01
Oct 14, 5:45 AM0.01
Oct 14, 4:45 AM0.01
Oct 14, 3:45 AM0.01
Oct 14, 2:45 AM0.01
Oct 14, 1:45 AM0.01
Oct 14, 12:45 AM0.01
Oct 13, 11:45 PM0.01
Oct 13, 10:45 PM0.01
Oct 13, 9:45 PM0.01
Oct 13, 8:45 PM0.01
Oct 13, 7:45 PM0.01
Oct 13, 6:45 PM0.01
Oct 13, 5:45 PM0.01
Oct 13, 4:45 PM0.01
Oct 13, 3:45 PM0.01
Oct 13, 2:45 PM0.01
Oct 13, 1:45 PM0.01
Oct 13, 12:45 PM0.01
Oct 13, 11:45 AM0.01
Oct 13, 10:45 AM0.01
Oct 13, 9:45 AM0.01
Oct 13, 8:45 AM0.01
Oct 13, 7:45 AM0.01
Oct 13, 6:45 AM0.01
Oct 13, 5:45 AM0.01
Oct 13, 4:45 AM0.01
Oct 13, 3:45 AM0.01
Oct 13, 2:45 AM0.01
Oct 13, 1:45 AM0.01
Oct 13, 12:45 AM0.01
Oct 12, 11:45 PM0.01
Oct 12, 10:45 PM0.01
Oct 12, 9:45 PM0.01
Oct 12, 8:45 PM0.01
Oct 12, 7:45 PM0.01
Oct 12, 6:45 PM0.01
Oct 12, 5:45 PM0.01
Oct 12, 4:45 PM0.01
Oct 12, 3:45 PM0.01
Oct 12, 2:45 PM0.01
Oct 12, 1:45 PM0.01
Oct 12, 12:45 PM0.01
Oct 12, 11:45 AM0.01
Oct 12, 10:45 AM0.01
Oct 12, 9:45 AM0.01
Oct 12, 8:45 AM0.01
Oct 12, 7:45 AM0.01
Oct 12, 6:45 AM0.01
Oct 12, 5:45 AM0.01
Oct 12, 4:45 AM0.01
Oct 12, 3:45 AM0.01
Oct 12, 2:45 AM0.01
Oct 12, 1:45 AM0.01
Oct 12, 12:45 AM0.01
Oct 11, 11:45 PM0.01
Oct 11, 10:45 PM0.01
Oct 11, 9:45 PM0.01
Oct 11, 8:45 PM0.01
Oct 11, 7:45 PM0.01
Oct 11, 6:45 PM0.01
Oct 11, 5:45 PM0.01
Oct 11, 4:45 PM0.01
Oct 11, 3:45 PM0.01
Oct 11, 2:45 PM0.01
Oct 11, 1:45 PM0.01
Oct 11, 12:45 PM0.01
Oct 11, 11:45 AM0.01
Oct 11, 10:45 AM0.01
Oct 11, 9:45 AM0.01
Oct 11, 8:45 AM0.01
Oct 11, 7:45 AM0.01
Oct 11, 6:45 AM0.01
Oct 11, 5:45 AM0.01
Oct 11, 4:45 AM0.01
Oct 11, 3:45 AM0.01
Oct 11, 2:45 AM0.01
Oct 11, 1:45 AM0.01
Oct 11, 12:45 AM0.01
Oct 10, 11:45 PM0.01
Oct 10, 10:45 PM0.01
Oct 10, 9:45 PM0.01
Oct 10, 8:45 PM0.01
Oct 10, 7:45 PM0.01
Oct 10, 6:45 PM0.01
Oct 10, 5:45 PM0.01
Oct 10, 4:45 PM0.01
Oct 10, 3:45 PM0.01
Oct 10, 2:45 PM0.01
Oct 10, 1:45 PM0.01
Oct 10, 12:45 PM0.01
Oct 10, 11:45 AM0.01
Oct 10, 10:45 AM0.01
Oct 10, 9:45 AM0.01
Oct 10, 8:45 AM0.01
Oct 10, 7:30 AM0.01
Oct 10, 6:45 AM0.01
Oct 10, 5:45 AM0.01
Oct 10, 4:45 AM0.01
Oct 10, 3:45 AM0.01
Oct 10, 2:45 AM0.01
Oct 10, 1:45 AM0.01
Oct 10, 12:45 AM0.01
Oct 9, 11:45 PM0.01
Oct 9, 10:45 PM0.01
Oct 9, 9:45 PM0.01
Oct 9, 8:45 PM0.01
Oct 9, 7:45 PM0.01
Oct 9, 6:45 PM0.01
Oct 9, 5:45 PM0.01
Oct 9, 4:45 PM0.01
Oct 9, 3:45 PM0.01
Oct 9, 2:45 PM0.01
Oct 9, 1:45 PM0.01
Oct 9, 12:45 PM0.01
Oct 9, 11:45 AM0.01
Oct 9, 10:45 AM0.01
Oct 9, 9:45 AM0.01
Oct 9, 8:45 AM0.01
Oct 9, 7:45 AM0.01
Oct 9, 6:45 AM0.01
Oct 9, 5:45 AM0.01
Oct 9, 4:45 AM0.01
Oct 9, 3:45 AM0.01
Oct 9, 2:45 AM0.01
Oct 9, 1:45 AM0.01
Oct 9, 12:45 AM0.01
Oct 8, 11:45 PM0.01
Oct 8, 10:45 PM0.01
Water level, 30 days at Rrv Cnl Blo Junction: the water from 0.00 to 0.01 feet of stage, the latest 0.01 feet.WATER LEVEL, 30 DAYSFTHIGH 0.01 FT, SEP 16, 8:00 PM · LOW 0.00 FT, SEP 15, 10:15 PM-0.04-0.020.000.020.040.06Sep 16Sep 21Sep 26Oct 1Oct 6Oct 110.01
Latest
0.01 ftOct 15, 9:30 PM
Highest
0.01 ftSep 16, 8:00 PM
Lowest
0.00 ftSep 15, 10:15 PM
Range
0.01 fthighest less lowest
Change
Rose 0.01 ftsince Sep 15, 10:15 PM
Readings
2,842
The readings these charts were drawn from, as a table
DayHigh ftLow ftAverage ftLast ftReadings
Oct 150.010.010.010.0187
Oct 140.010.010.010.0196
Oct 130.010.010.010.0196
Oct 120.010.010.010.0196
Oct 110.010.010.010.0196
Oct 100.010.010.010.0192
Oct 90.010.010.010.0196
Oct 80.010.010.010.0196
Oct 70.010.010.010.0192
Oct 60.010.010.010.0196
Oct 50.010.010.010.0196
Oct 40.010.010.010.0196
Oct 30.010.010.010.0196
Oct 20.010.010.010.0196
Oct 10.010.010.010.0196
Sep 300.010.010.010.0192
Sep 290.010.010.010.0196
Sep 280.010.010.010.0196
Sep 270.010.010.010.0196
Sep 260.010.010.010.0196
Sep 250.010.010.010.0196
Sep 240.010.010.010.0196
Sep 230.010.010.010.0196
Sep 220.010.010.010.0196
Sep 210.010.010.010.0192
Sep 200.010.010.010.0196
Sep 190.010.010.010.0188
Sep 180.010.010.010.0196
Sep 170.010.010.010.0192
Sep 160.010.000.000.0188
Sep 150.000.000.000.007

How it reports

Schedule
every houron the hour's :30
Reports received, 24 hours
24 of 24100% of its schedule
Reports received, 7 days
167 of 16899.4% of its schedule
Longest silence, 7 days
2 hoursfrom Oct 10, 7:30 AM
Latest report
Oct 15, 9:30 PMlocal time
Time to reach Storm Station
13 min9 in 10 within 13 min

From Storm Station's own record of every report it heard from this station.

Its schedule is one report every hour, 24 in 24 hours. Two reports in the same hour count as one received.

Ranking Statistics

247 score96.0of 100

Oregon median
92.2the median score of 1,635 stations
Scoring higher
241stations in Oregon
Sharing its score
24ranks 242 to 265
Points deducted
4.02.2 accuracy, 1.1 forecast check, 0.5 arrival, 0.2 reports received
Counted at the median
Accuracy, instrument checks, forecast checknot measured at this station; Oregon median 89.1, 100.0, 89.5
Next above
HPWO3rank 250; ahead on longest silence 90 min against 120 min
Next below
NSGO3rank 257; behind on median arrival 12 min 38 s against 12 min 39 s
Sharing its rank
3other stations, equal on every measure

Equal scores are ordered by the share of scheduled reports received, then the reports due in the week (the longer record first), then the median arrival, then the longest silence.

  1. Reports receivedweight 3599.434.8 of 35 pointsOregon median 98.2167 of 168 scheduled reports received in 7 days
  2. Arrivalweight 1094.79.5 of 10 pointsOregon median 84.9half its reports arrived within 13 min
  3. Continuityweight 10100.010.0 of 10 pointsOregon median 100.0longest silence 2 h, on a schedule of one report every 60 min
  4. Accuracyweight 20-17.8 of 20 points, at the medianOregon median 89.1-
  5. Instrument checksweight 15-15.0 of 15 points, at the medianOregon median 100.0-
  6. Forecast checkweight 10-9.0 of 10 points, at the medianOregon median 89.5-

The score is the weighted mean of its six parts, from the last 7 days. How a station is ranked sets out each part.

How each part is scored
Reports received
Full marks for every scheduled report received, none for none, in proportion between
Arrival
Full marks for a median arrival within 10 min, none at 60 min
Continuity
Full marks for a longest silence of 3 reports or less (3 h), none for 72 (72 h)
Accuracy
Full marks within 1.5 °F of its reference, typically, none beyond 8.0 °F
Instrument checks
Full marks for no reading failed, none for 5 per cent or more
Forecast check
Full marks within 2 °F of the forecast on average, none at 8 °F

Near Rrv Cnl Blo Junction

How to read a gauge

A gauge measures the height of the water where it stands, its stage, in feet above a fixed mark at that gauge. Two gauges' stages are not comparable: each is measured from its own mark, and a reservoir's is often its height above sea level.

The stage shown is the latest the gauge reported, with the time it reported it. Storm Station hears each gauge on its own schedule and ranks it among its state's stations by its 247 score, how reliably it reports and how its readings hold up: that is its 247 rank.